Kafireas Wind Cluster

Wind

Technology

In Operation

Status

167.90 MW

Installed capacity

505.4 (average) GWh / year

Energy production

294.2 (average) metric tons per year

CO2 emissions avoided

58,982 households per year (Annual energy consumption of each 11,880 kWh per home)

Electricity Equivalent
gallery image
gallery image
gallery image
gallery image

Kafireas Wind Cluster

The Kafireas Wind Cluster, located in South Evia in Greece, is the biggest wind cluster in Greece. Composed of 8 wind farms with 73 wind turbines, the project has a total installed capacity of over 167.9 MW.

gallery image
gallery image
gallery image
gallery image

Operation & Impact on Local Communities

The Kafireas Wind Cluster is comprised of 8 wind farms: 

  • Anatoli – 16.10MW
  • Kathara – 18.40MW
  • Kerasia – 27.60MW
  • Milia – 18.40MW
  • Mytikas – 29.90MW
  • Paliopyrgos – 13.80MW
  • Platanos – 13.80MW
  • Spilia – 29.90MW

The wind turbines are type Enercon E70, 2.3MW each, with a hub height of 64 metres.

 

 

Kafireas: Facts and Numbers

The winds crossing the site have an average speed of 11.95 m/s, resulting in the wind power plant essentially producing an average of 505 GWh per year. The plant’s operation results in avoiding 318.9 (average) metric tonnes of CO2 emissions per year, while it meets the energy needs of nearly 58,000 households annually

Highlights of the plant’s construction include:

  • 550,000 tonnes of soil and stones were excavated and were then redirected to recycling
  • Commitment to safety procedures and guidelines during construction resulted in amassing 1.5 million hours with no accidents.
  • total of 100 km of roads that connect the southwest to the southeast side of the island
  • 2 substations 30kV/150kV, an Overhead Power Transmission Line of 25 km, a submarine cable of 45 km and Underground High-Voltage Line of 18 km
  • 3% of the revenue from the sale of electricity produced in the plant goes to local municipalities and communities
  • Investment of more than 300 million euros supported the local economy
  • 1,200 jobs, 45% of which were covered by the local community
  • Replacement of main components, blade repairs, predictive maintenance, in-house remote monitoring and control, and quality assurance site inspections.

 

 

Plant Sustainability & Local Communities

Since the beginning of the park’s construction, we have worked alongside the local community, by supporting associations in the area and by opening the site to visitors for educational purposes and other activities. We reinforced local apiculture and livestock, established a bird protection system within the plant, and safeguarded biodiversity in Evia, monitoring underwater activities to ensure that local marine species were in no way harmed. Moreover, we closely collaborated with over 150 beekeepers in the area, helping the local Kissouri honey receive the Protected Designation of Origin (PDO) label by the European Union, in April 2024.

At the pinnacle of our initiatives lies the reforestation of the historical forest of Kastanologgos. We have completed the restoration of the centuries-old wild chestnut forest, which had decreased by 40% in recent decades, by planting 30,000 new native species in an area that spans 660 acres. Additionally, during construction, two archaeological sites came to light, parts of a quarry and the remains of an ancient furnace. Thanks to our contribution, the sites have been developed and visitors are encouraged to discover the new findings.

We constructed and continue to maintain a total of 100 km of roads, that connect the southwest and the southeast side of the island, facilitating the connection of Karystos to many remote villages. We continue to support local basketball and football clubs, cycling activities for Karystos cycling team and, in July 2020, we organized the first race of the Mountain Bike National Championship to take place within an area of wind farms. Additionally, to contribute to the social work of the “Hand in Hand” Association for the Protection of People with Disabilities, we donated a transportation van and other equipment that facilitate their educational needs.

 

 

Innovation in Kafireas

In line with the company’s commitment to integrating sustainability into all project stages, numerous initiatives have been carried out in Kafireas. 

We implemented a Sustainable Construction Site model, a set of guidelines aiming at measuring the impacts we cause and mitigating them, adopting sustainable solutions during the wind plant construction period. We installed PV panels on site to cover part of its energy needs avoiding CO2 emissions and recycled waste and construction materials, with the help of local people. We are also implementing state-of-the-art technologies and practices for maintenance purposes to identify new smart and efficient ways of working. A few examples are the rainwater and fog collection systems, the digital checklists for pending and performed actions, the use of smart glasses for remote technical support and site visits, as well as the use of drones for blade inspection and measurements.

Additionally, we implemented new practices to construct and protect the safe operation of the 150kV high voltage electrical system through a SVC Static VAR compensator, fitted siliconized insulation in primary equipment of electrical substations, used drones to construct the aerial wiring of the high voltage lines, and utilized a Remotely Operated Vehicle (ROV), to connect and periodically inspect the submarine cable.


 

You may download the informational brochure for Kafireas Wind Cluster here.

Milestones

milestone image
milestone image
milestone image
milestone image
milestone image
milestone image
milestone image
milestone image

2018

Starting of construction phase.

2019

Start of operations and inauguration, attended by the Prime Minister of Greece.

2020

We hosted a race of the Mountain Bike National Championship, within Kafireas.

2021

The Kastanologgos reforestation project continued with the planting of 30,000 new trees.

2022

In Karystos, we organized sports activities for the local youth.

2023

For Global Wind Day, we organized an inter-club mountain bike competition.

2024

In April, the local Kissouri honey received the PDO designation, with our support.

2025

We completed the reforestation and supervision program in Kastanologgos, giving new life to the forest.

Kafireas | A Milestone Project

Kastanologgos Chestnut Forest, South Evia

Creating Shared Value in Karystos

Related Articles

June 5, 2025
We have completed the reforestation of 660 acres in South Evia
After the five-year reforestation and supervision program in Kastanologgos in South Evia, we are giving new life to the forest Subscribe on LinkedIn On the occasion of World Environment Day (5 June), we announce the completion of the reforestation project in the area of Kastanologgos, in South Evia, near the "Kafireas" Wind Farm Cluster. This ambitious initiative, which was implemented under the guidance of the Forestry Department and the Local Authorities, is not only a milestone in the conservation and regeneration of the ancient wild chestnut forests of the region,...
April 23, 2024
Kissouri Honey is registered as a PDO with our contribution
With our crucial contribution and after 5 years of procedures, the European Commission registers Greek...
July 11, 2025
The story of Kastanologgos on Naftemporiki TV
We spoke to Naftemporiki TV about the reforestation project we completed in Kastanologgos, giving new...